NextGen Socio & Enviro Advisors

The Tamil Nadu Factories Rules, 1950

Arrangement of Rules

G.O. No. 1041 of 1950 · Tamil Nadu · 68 chapters and schedules, 167 rules

SCHEDULE XVIII

SCHEDULE XVIII

COMPRESSION OF OXYGEN AND HYDROGEN PRODUCED BY THE ELECTROLYSIS OF WATER

1. The room in which electrolyser plant is installed shall be separate from the plant for

storing and compressing the oxygen and hydrogen and also the electric generator room. 212

2. [The purity of oxygen and hydrogen shall be tested by a competent person at least once

in every shift at the following points

(i) in the electrolysis room;

(ii) at the gas-holder inlet; and

(iii) at the suction end of the compressor. The purity figures shall be entered in the register and signed by the persons carrying out such tests:

Provided, however, that if the electrolyser plant is fitted with automatic recorded to purity of oxygen and hydrogen with alarm lights, it shall be sufficient if the purity of the gases is tested at the suction end of the compressor only.]

3. The oxygen and hydrogen gases shall not be compressed if their purity as determined

under clause 2 above falls below 98 percent at any time.

3-A. The bell of any gas-holder shall not be permitted to go within 30 cms of its lowest position when empty and a limit switch shall be fitted to the gas-holder in such a manner as to switch off the compressor motor when this limit is reached. 213 4. [In addition to the limit switch in the gas-holder, a sensitive negative pressure switch shall be provided in, or adjacent to the suction main for hydrogen, close to the gas-holder and between the gas-holder and the hydrogen compressor to switch off the compressor motor in the event of the gas-holder being emptied to the extent as to cause vacuum.] 214

5. [Omitted.]

6. The water and caustic soda and caustic potash used for making electrolytes shall be of

standards suitable for electrolysis.

7. Electrical connections at the electrolyser cells and at the electric generator terminals shall be so constructed as to preclude the possibility of wrong connections leading to the reversal of polarity and in addition an automatic device shall be provided to cut off power in the event of reversal of polarity owing to wrong connections either at the switch board or at the electric generator terminals.

8. Oxygen and hydrogen gas pipes shall be painted with distinguishing colors. Whenever an

hydrogen pipe is opened for repairs or any other work, on re-connection the pipe shall be purged of &I air before hydrogen is allowed to pass through that pipe:

Provided that after repairs, hydrogen pipes shall preferably be purged by an inert gas like nitrogen, whenever possible, before introducing hydrogen for final purging.

9. All electrical wiring and apparatus in the electrolyser tooth and hydrogen compression

room shall be of flame-proof construction or enclosed in flame-proof fittings and no naked light or flame shall be allowed to be taken either in the electrolyser room or where compression and filling of the gases is carried on and such warning notices shall be exhibited in prominent places.

10. No part of the electrolyser plant and the gas-holders and compressor shall be subjected to welding, bracing, soldering or cutting until steps have been taken to remove any explosive substance from that part and render the part safe for such operations and after the completion of such operation no explosive substance shall be allowed to enter that part until the metal has cooled sufficiently to prevent risk of explosion.

11. No work of operation, repair or maintenance shall be undertaken except under the direct supervision of a person who by his training, experience and knowledge of the necessary precautions against risk of explosion is competent to supervise such work. No electric generator after erection or repairs shall be switched on to the electrolysers unless the same is certified by the competent persons under whose direct supervision erection or repairs arc carried on to be in a safe condition and the terminals have been checked for The polarity as required by clause 7.

12. Every part of the electrolyser plant and the gas-holders and compressor shall have a

regular schedule of overhaul and checking and every defect noticed shall be rectified forthwith. 215